SunWatts Interconnection Application
When this form is completed by the member, and received by Sulphur Springs Valley Electric Cooperative, Inc. (SSVEC), the member will be placed on the Sun Watts reservation list and subject to the interconnection requirements, rate classifications, charges, and tariffs in effect on the date SSVEC receives the form (Receipt Date).
Submission of this form (prior to the installation) completed the requirements of Arizona law (SB1417) as the notice to the Electric Utility. The local Building Inspection Department is responsible to assure that the proposed installation meets all applicable code. Submission of this Application gives the Solar Contractor permission to proceed from SSVEC.
The system may not be left running before it has been inspected and approved by an SSVEC employee. If the system is left on it creates a safety risk for our crews and we will lock off the system to prevent injury or damage.
If your Renewable Project is not completed within SIX (6) MONTHS from the Receipt Date, your reservation will be canceled, and you must fill out a new Application. You will be subject to the rules and regulations in effect as of the date SSVEC receives the new application, including but not limited to, any changes in net metering rules, rate classifications, charges, and tariffs.